EN | SP

TDDA

Constituyentes 1072

Geometrica Developers gave us the challenge to transform the existing structural space frame – a 23 tall meter wall, into a unique intervention that integrates the rest of the architectural complex. We decided to transform the structure into an art installation that uses a combination of both: LEDs and perforated metal panels. The main purpose of our proposal is to diminish the visual impact of the five story structure.

TYPE 01 ArchitectureSTATUS ConstructedCLIENT Geometrica Developers
Back to Projects